Ashley J. Ross Consulting

  • About Us
  • Services
  • Our Work
  • Clients
  • Contact

“No Way The Floats Will Hold After All This”

ajrr30January 19, 2023Articles, Case Studies

338 ULTRA MAG High Flow float equipment with the Integral Debris Management System

Annular Pressure Successfully Eliminated

ajrr30January 3, 2023Case Studies

The use of the Prenup enabled the use of an optimized cement slurry in which the thickening time was equal to placement time.

Custom DV Built In Two Days, Frac’d Through 80 Stages

ajrr30November 22, 2022Case Studies, Uncategorized

Prior to completion, 5.500 production casing was found to be leaking in the uncemented vertical.

  • About Us
  • Services
  • Our Work
  • Clients
  • Contact